08/05/2009 - Make a start on the
forward Fuselage
Drilling main longerons and adding short rivets to hold the skin
as per the instructions

Making sure that the engine brackets align and fit
to the longeron as required

Measuring the 5/8" gap all the way around the
firewall

The match drilling through (use boelube) skin and
steel firewall

Tada
